Publicaciones en revistas científicas o libros:

  • Using mathematical models to improve the current practice in a Home Health Care Problem , S. Quintanilla, F. Ballestín, Á. Pérez. En proceso de referee.
  • Scheduling and rescheduling elective patients in operating rooms to miminise the percentage of tardy patients, F. Ballestín, Á. Pérez, S. Quintanilla. Aceptado en Journal of Scheduling. https://doi.org/10.1007/s10951-018-0570-4
  • A multistage heuristic for storage and retrieval problems in a warehouse with random storage, F. Ballestín, Á. Pérez,S. Quintanilla. Aceptado en International Transactions in Operational Research. http://onlinelibrary.wiley.com/doi/10.1111/itor.12454/full
  • Heuristic algorithms for a storage location assignment problem in a chaotic warehouse, S. Quintanilla, Á. Pérez, F. Ballestín, P. Lino. Engineering Optimization, 47 (10), 1405-1422 (2015).
  • Integer Preemption Problems, S. Quintanilla, P. Lino, Á. Pérez, F. Ballestín, V. Valls. Capítulo 12 - Handbook on Project Management and Scheduling. Springer's International Handbooks on Information Systems series, eds: Cristoph Schwindt and Jürgen Zimmermann (2014).
  • Theoretical and Practical Fundamentals, F. Ballestín, R. Blanco. Capítulo 22 - Handbook on Project Management and Scheduling. Springer's International Handbooks on Information Systems series, eds: Cristoph Schwindt and Jürgen Zimmermann (2014).
  • A hybrid genetic algorithm with transmitted jsutification for the RCPSP with due dates, Ballestín and Blanco, Boletín de estadística e investigación operativa BEIO, 30(2), 125-149(2014).
  • A multi-objective approach for a project scheduling problem with due dates and temporal constraints infeasibilities, Ángeles Pérez, Sacramento Quintanilla, Pilar Lino, Vicente Valls, International Journal of Production Research Special Issue: New Developments in Scheduling and Manufacturing, 52 (13), pp. 3950-3965, 2014
  • "Static and dynamic policies with RFID for the scheduling of retrieval and storage warehouse operations".Francisco Ballestín, Ángeles Pérez, Pilar Lino, Sacramento Quintanilla, Vicente Valls.Computers & Industrial Engineering 66,pp. 696-709,2013.
  • Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres, S. Quintanilla, Á. Pérez, P. Lino, V. Valls, European Journal of Operational Research 219 (1), pp. 59-72, 2012.doi:10.1016/j.ejor.2011.12.018
  • Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm, F. Ballestín, F. Mallor, P. Mateo, Optimization and Engineering, 13 (4), pp. 663-687,2012,doi:0.1007/s11081-011-9157-z
  • Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems, F. Ballestín, R. Blanco, Computers and Operations Research, 38, pp. 51 - 62, 2011.
  • A double genetic algorithm for the mrcpsp/max, A. Barrios, F. Ballestín, V. Valls, Computers and Operations Research, 38, pp. 33 - 43, 2011.
  • Resource-constrained project scheduling for timely project completion with stochastic activity durations , F. Ballestín, R. Leus, Production and Operations Management, 2009.
  • Scheduling projects with limited number of preemptions, Ballestín, Valls, Quintanilla, Computers & Operations Research, 36, pp. 2913 - 2925, 2009.
  • Skilled Workforce Scheduling in Service Centres , Valls, Pérez, Quintanilla, European Journal of Operational Research, 193, pp. 791 - 804, 2009.
  • Scheduling in a continuous galvanizing line, Valls, Pérez, Lino, Computers & Operations Research,36, pp. 280 - 296, 2009.
  • Using RFID information in routing and sequencing warehouse operations, Ballestín, Lino, Pérez, Quintanilla, Valls, Workshop Proceedings of the 5th International Conference on Intelligent Environments, Volume 4 Ambient Intelligence and Smart Environments,4, pp. 77 - 83, Ios Press,2009.
  • Meta-heuristics for stable scheduling on a single machine, F. Ballestín, R. Leus, Computers & Operations Research, 35, pp. 2175 - 2192, 2008.
  • A Hybrid genetic algorithm for the RCPSP, Valls, Ballestín, Quintanilla, European Journal of Operational Research, 185, pp. 495 - 508, 2008.
  • Different codifications and metaheuristic algorithms for the Resource Renting Problem with minimum and maximum time lags, F. Ballestín, Advances in Evolutionary Computation for Combinatorial Optimization, Studies in Computational Intelligence.153,pp. 187 - 202, Springer International, 2008
  • Resource leveling in make-to-order production: modeling and heuristic solution method, F. Ballestín, C. Schwindt, J. Zimmermann, International Journal of Operations Research, 4,pp. 50 - 62, Inderscience Publishers,2007.
  • An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem, F. Ballestín, N. Trautmann, International Journal of Production Research, 46, pp. 6231 - 6249, 2007.
  • When it is worthwhile to work with the stochastic rcpsp?, F. Ballestín, Journal Of Scheduling, 10, pp. 153 - 166, 2007.
  • Heuristic procedures for reactive project scheduling, S. Van de Vonder, F. Ballestín; E, Demeleumeester, W. Herroelen, Computers & Industrial Engineering, 52, pp. 11 - 28, 2007.
  • Pre-emption in resource-constrained project scheduling, V. Valls, F. Ballestín, S. Quintanilla, European Journal of Operational Research,189, pp. 1136 - 1152, 2007.
  • Project Scheduling Optimization in Service Centre Management Valls, Gómez-Cabrero, Pérez, Quintanilla, Tijdschrift voor Economie en Management, LII, pp. 341 - 365, 2007.
  • Planificación de la producción en una empresa de contrachapado, Valls, Ballestín, Lino, Pérez, Quintanilla,Rect@ - Revista Electrónica de Comunicaciones y Trabajos de ASEPUMA, .pp. 285 - 302, 2007.
  • A genetic algorithm for the resource renting problem with minimum and maximum time lags, F. Ballestín, Evolutionary Computation in Combinatorial Optimization, Lecture Notes in Computer Science, LNCS 4446/2007 , pp. 25 - 35, Springer Berlin, Heidelberg, 2007.
  • Justification Technique Generalisations, Valls, Ballestín y Quintanilla 2006. Perspectives in Modern Project Scheduling. Editado por J. Jozefowska and J. Weglarz. Springer Capítulo 8, pp. 205- 224.
  • Due Dates and RCPSP, Valls, Ballestín y Quintanilla 2006. Perspectives in Modern Project Scheduling. Editado por J. Jozefowska and J. Weglarz. Springer Capítulo 4, pp. 79- 104.
  • Justification and RCPSP: a technique that pay, Valls, Ballestín y Quintanilla 2005, European Journal of Operational Research, 165, pp. 375- 386.
  • A Population Based Approach to the Resource Constrained Project Scheduling Problem, Valls, Ballestín y Quintanilla 2004. Annals of Operations Research, 131, pp. 305- 324
  • Resource-constrained Project Scheduling: A Critical Activity Reordering Heuristic, Valls, Ballestín y Quintanilla 2003, European Journal of Operational Research 149, pp. 282-301.
  • Criticality Analysis in Activity-on-Node Networks with Minimal Time Lags, Valls y Lino 2001, Annals of Operations Research 102, pp. 17- 37.
  • Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines, Laguna, Lino, Pérez, Quintanilla, Valls 2000. European Journal of Operational Research, 127, pp. 444- 457.
  • Project Scheduling with Stochastic Activity Interruptions, Valls, Laguna, Lino, Pérez y Quintanilla 1999. Project Scheduling. Recent Models, Algorithms and Applications, . J. Weglarz. Kluwer Academic Publishers, vol. 102, pp. 333- 353.
  • A Tabu Search approach to machine scheduling, Valls, Pérez y Quintanilla 1998. European Journal of Operational Research, 106, pp. 277- 300.
  • Pre-processing techniques for resource allocation in the heterogeneous case, Valls, Pérez y Quintanilla 1998. European Journal of Operational Research 107, pp. 470- 491.
  • A Modified Tabu Thresholding Approach for the Generalised Restricted Vertex Colouring Problem, Valls, Pérez y Quintanilla 1996. META-HEURISTICS: Theory & Applications, Ed. I.H. Osman and J.P. Kelly. Kluwer Academic Publishers, pp. 537- 554.
  • A graph colouring model for assigning a heterogeneous workforce to a given schedule, Valls, Pérez y Quintanilla 1996. European Journal of Operational Research, 90, pp. 285-302.
  • A Heuristic Algorithm for Project Scheduling with Splitting Allowed, Valls, Martí y Lino 1996. Journal of Heuristics, 2, pp. 87- 104.
  • Un sistema experto para la gestión operativa de la producción, Valls, Pérez y Quintanilla 1995. Revista Europea de Dirección y Economía de la Empresa, 4, pp.117-130