Questionnaire for ASPERA Roadmap Working Groups

Name of Working Group:

For each project, please provide the following information using the grey boxes or, when stated, using the Excel sheet provided. Note: where project costs are quoted in this document, full costs should be used, including all manpower, materials, consumables etc. Costs for operations should be provided separately. It is recognised that these costs may be estimates.
Project 1: …
General
1. Name of the project (new or existing, detector or observatory)

 

2. Short description of the project (or refer to the text in the draft roadmap):

 

3. Short description of the status of the project including funding status: Categories of the status includes: conceptual; not approved; approved; design study; construction; operational.

 

4. What is the status of this collaboration? Categories of the status includes: none; in formation; formed; collaboration agreement exists; collaboration agreement agreed.This information should include non-European collaborations.

 

5. What are potential obstacles in realising this collaboration if applicable? Categories of obstacles include: lack of expertise; existing commitments; competing facilities; geographical distribution; funding; availability of start up funds.

 


6. Envisaged Pan-European collaboration
Please provide the names of the organisations of the envisaged Pan – European collaboration and their roles if applicable. Please include the academic institutions and indicate the appropriate national funding agency.

Organisation Short description of role
<org 1>  
<org 2>  
<org 3>  
...  


7. Technology development required
What are the main technological challenges (R&D effort) if applicable? For each R&D challenge, please provide information on possible industry involvement in the R&D.

R&D challenge Short description and possible industry involvement
<challenge>  This R&D concerns the…
...  Possible industry involvement by …
...  
...  

8. For which of the generic R&D challenges given above, do you wish to see funded as a stand alone project, funded by a common European call? Please indicate the timescales and the profile of funding required.

 

9. Linking the infrastructure
Please provide information on how the infrastructure (access to locations & on site facilities) will be made available to all research groups within Europe and outside, and what is required to establish this?

 


10. More detailed planning, resource information
Please provide the anticipated timetable ,major milestones and the appropriate resources needed using the Excel sheet provided, using a separate worksheet per project.

 

11. Is the existing data taking and computing analysis capacity sufficient or not. If not, what is the likely additional requirement?

 

12. What are the main risks of the project?
Please provide risks in the categories : technical; schedule; cost; availability of expertise; manpower; location; competing experiments.

 

13. Most recent detailed description of the project
Please provide the electronic location of the most recent detailed description of the project (including the most updated author list)

Compiled by :
Date :
Email :



Project 2: …