.jpg)
The Manines Urban Waste Treatment Plant (Installation 3) was built in 2012. It has a waste treatment capacity of 350,000 tonnes / year and together with the "Installation 1" (in TM Quart de poblet) assume the treatment of all waste generated in the Metropolitan Area of Valencia https://www.sav.es/areas-de-negocio/tratamiento-y-eliminacion-de-residuos/