Changes to the fire prevention system of the Faculty of Pharmacy and Food Sciences and of the Inter-Faculty Classroom Building Rehabilitation
Change in the air conditioning control system of the Header buildings, ICMoI and institutes of the UV Science Park Rehabilitation
Project for executing the construction works of the general physics laboratory, Block C. Conservation
Remodelling work on the second floor and construction of a covered space for equipment on the rooftop of Block E for the Department of Analytical Chemistry at the Burjassot-Paterna Campus Rehabilitation
Underground medium-voltage line from the Feria València substation to the Burjassot-Paterna Campus New construction
Underground medium-voltage line from the Feria València substation to the Paterna Science Park New construction