Project for executing the construction works of the general physics laboratory "Fernando Senent", Block C.
Conservation Conservation
 

The Remodelling of the Physics Teaching Laboratory on the ground floor is planned.

The project involves remodelling the space of the general Physics laboratory located on the ground floor of Block C. The use of new materials and systems is intended to improve the thermal and acoustic conditions of the classroom.

The system Blower Door will be used to track the project progress. Water tightness measurement.

The Faculty of Physics is located in two buildings, Physics C and Physics D. The partition walls will be demolished and the aluminium windows substituted for FSC wood windows. There is ventilated cellulose fibre boarding, placed on wooden battens. In which 50 mm agglomerated cork panels are mechanically fixed to the facing.

The ceiling is left with acoustic false ceiling panels finished with micro-perforated cellulose panel.

The electrical installations will be improved by replacing the lighting with LEDs, incorporating an electrified rail and improving the air conditioning in the classroom with a VRV system. A multifunctional remote control system will also be installed. The teaching laboratory is equipped with an office and an adjoining storeroom. The fire extinguishing system will be upgraded and a workbench and display cabinets above it will be added to the classroom equipment upgrade.

Progress of the performance
Authorisation of the expenditure by the University Head Office and the Office of the Vice-Principal for Economy and InfrastructuresAuthorisation of the expenditure by the University Head Office and the Office of the Vice-Principal for Economy and Infrastructures
Preparation of the technical specifications (PPT)Preparation of the technical specifications (PPT)
Preparation by the SCA of the table of characteristics annexed to the specific administrative clauses (PCAP) and revision of the PPTPreparation by the SCA of the table of characteristics annexed to the specific administrative clauses (PCAP) and revision of the PPT
Call for tenders for the design and management of the projectCall for tenders for the design and management of the project
Decision to award the project designDecision to award the project design
Preparation of the project designPreparation of the project design
Application for building permitApplication for building permit
Tender for the workTender for the work
Signing of the contractSigning of the contract
Start of the workStart of the work
Handover stageHandover stage
Start date May 20th, 2024
Completion date July 20th, 2024
Budget

MEB 232,015.15 euros.

Licensing dossier Solicitut Declaració Responsable
Issuing a licence NA/60010435/0006/000038789
Funding Entities

Plan Irta 2023

Location

Manteniu premuda la tecla Ctrl mentre us desplaceu per apropar o allunyar el mapa

Authors of the project and project management
  • Mascaró Bosch, Julio
  • Arquitecte
Construction company

Consval 2012, S.L.

UV Responsible
Technical and Maintenance Service

Blasco Ibáñez Campus

Av. Blasco Ibañez, 13

46010 Valencia (Valencia)

+34 963 864 205

+34 963 983 479

https://www.uv.es/stecnic

servei.tecnic@uv.es