Corporal Expression Classroom (Tarongers Campus)
Ventilation of the Corporal Expression Classroom (Tarongers Campus)
New construction New construction
 

The aim of the project is to install a forced ventilation system in the pavilion and play area of the Corporal Expression Classroom. It is also planned to install large format fans anchored to the ceiling, which will provide a slight air movement and comfort for the performers by evaporation of sweat.

The work will consist of the installation of air impulsion equipment, ducts and nozzles on one side of the performance or sports area and extraction on the opposite side with grilles, ducts and extraction equipment to create a sweeping effect.
Temperature, humidity and CO2 sensors will be installed to monitor the environment inside and outside the classroom at all times. Large format ceiling fans will also be installed to move air vertically through the three sections of the classroom.

All of this will be extended to new air movement ducts in the event of insufficient perceived comfort, and even to the implementation of a rooftop air movement unit that would temper the incoming outside air to reduce the temperature inside.

Progress of the performance
Authorisation of the expenditure by the University Head Office and the Office of the Vice-Principal for Economy and InfrastructuresAuthorisation of the expenditure by the University Head Office and the Office of the Vice-Principal for Economy and Infrastructures
Preparation of the technical specifications (PPT)Preparation of the technical specifications (PPT)
Preparation by the SCA of the table of characteristics annexed to the specific administrative clauses (PCAP) and revision of the PPTPreparation by the SCA of the table of characteristics annexed to the specific administrative clauses (PCAP) and revision of the PPT
Call for tenders for the design and management of the projectCall for tenders for the design and management of the project
Decision to award the project designDecision to award the project design
Preparation of the project designPreparation of the project design
Application for building permitApplication for building permit
Tender for the workTender for the work
Signing of the contractSigning of the contract
Start of the workStart of the work
Handover stageHandover stage
Start date June 1st, 2024
Completion date September 1st, 2024
Budget

Estimated cost: €55,000

UV Responsible
Technical and Maintenance Service

Blasco Ibáñez Campus

Av. Blasco Ibañez, 13

46010 Valencia (Valencia)

+34 963 864 205

+34 963 983 479

https://www.uv.es/stecnic

servei.tecnic@uv.es